Right-Size Your Grid Capacity: The Energy Needs Workshop
Clarity from connection to adoption
One session. Evidence-led loads. Actionable next steps.
FHS
HEM
BTR
New Build
Conversions
Aligned with the 2025 Future Homes Standard (FHS) and Home Energy Model (HEM) requirements.
Check Workshop Availability
Who this is for
If any of these sound familiar, this workshop is for you.
SME developers or housebuilders planning 20 to 300 homes and unsure if the connection is oversized or off sequence
Build to Rent or apartment schemes where BNO responsibilities may apply
Brownfield or conversion projects changing use class with unclear capacity headroom
Sites waiting on a PoC or stuck in requotes and resets
Teams weighing DNO direct against ICP with IDNO adoption and AAV
Projects introducing ASHP, PV, EV chargers or batteries with no defensible ADMD
Programmes that need tender-ready inputs within weeks, not months
M&E, utilities or planning consultants who need a decision-grade baseline for clients
Check Workshop Availability
Quick self-check
We do not have a confirmed PoC yet
Our ADMD is a block estimate rather than evidence-led
We have not space-proofed intake, risers or trenches
We are unsure if IDNO adoption would reduce total cost
Requotes or redesigns have already eaten time and budget
If you tick one or more, you will get value from the session.
Fix These Capacity Issues
What you will get from the workshop
Outcomes in plain English
A defensible ADMD baseline so your PoC request is clear and credible
A recommended route to adoption, with pros and cons for DNO versus ICP with IDNO and AAV
An options table that balances Capacity, Cost, Compliance and Carbon for your scheme
A short risk register with actions that remove requotes, redesigns and delays
How the session runs
Pre work
: you share plot count, dwelling mix, heat strategy, current kVA and a site plan
Live session
: we set the right order, test route options, and agree decision gates
Post
: you receive a two to three page summary and a PoC input checklist ready to use
What is inside the summary pack
One page pathway from connection to adoption with clear next steps
Route comparison including who does what and when
Space and layout prompts for intake, risers and trenches
Assumptions log so suppliers can see what was known, unknown and agreed
Where this adds the most value
Sites at concept or early planning where a quick direction unlocks programme decisions
Conversions or BTR where BNO responsibilities and space proofing matter
Schemes that suspect oversizing or that have suffered resets and lost time
Who should attend
Developer or housebuilder lead, MEP or utilities lead, and the project manager
Optional: planning consultant or cost consultant if decisions are time sensitive
Turnaround and next step
Pack delivered within five working days
If needed, you can add an Optioneering and Simulation Pack for constrained sites
Book your Energy Needs Workshop and get from uncertainty to a clear route in one step.